← Back to solutions

Solutions

Mobile Processing Unit

Container system for processing of plastic waste / material, electricity and heat production, and energy storage.

Mobile Processing Unit on a semi-trailer with the side platform open

Conceptual design – the images are 3D visualizations. The manufacturing layout is subject to 3D coordination.

How it works

The container travels closed and unfolds on site.

  1. Transport – closed container on a road semi-trailer.
  2. Setup – stabilizing supports lowered, tractor disconnected.
  3. Operation – side platform opened for access and energy operation.
Closed container on a semi-trailer
Transport – closed container.
Unit with the side platform and stairs open
Operation – side platform open.

Four interconnected technology zones

A

Thermal processing

  • 3 furnaces, each with a cooler

B

Gas branch + CHP

  • gas bag
  • gas filler
  • dryer + gas filter
  • gas pressure vessels
  • regulation station
  • cogeneration unit (CHP)

C

Oil treatment

  • oil generator
  • oil filtration
  • LTO tank
  • TTO tank

D

Electrical + battery

  • switchgear
  • battery storage

A fire barrier separates the gas branch (B) from oil treatment (C). Sixteen components form one functional whole.

Top view of the container with the component layout
Top view of the 12 × 2.4 m container – the order of all 16 components.

Zone A – thermal processing

Three furnaces run independent cycles. Electrically heated reactors operate as separate process units. Coolers then condense the liquid fraction and stabilize the gas branch.

550 l / 300 kg

charge of one furnace

900–1,000 kg

total charge · 3 furnaces · 12 h

24 m³

water charge in coolers

Three furnaces in the open side section of the container
Three furnaces with coolers.

Energy balance

Both production branches feed one energy balance.

80–100 kWh

gas branch · 33 m³ of gas per hour

80–100 kWh

oil branch · 33 l of oil per hour

160–200 kWh

total output – electrical energy

80 kWh peak

own consumption · 40 kWh on average

120–160 kWh

surplus electricity available during production

min. 350 kWh

usable heat for heating

The system runs from the battery storage, which is recharged from production. Depending on needs and settings, a reserve of oil and gas is built up.

Key parameters

12 × 2.4 × 2.1 m

container dimensions

20 / 23 t

empty / with fuel reserves, including container

24 m³

water in coolers

All components are custom-made by their manufacturers. The container is also modified with openable and removable walls.